How my disconnect is wired to my Sol-Ark 15k #solar

preview_player
Показать описание
This video shows how I wired my 200 Amp disconnect to my Sol-Ark 15k. But the same setup could also be used for the EG4 18k PV inverter also.

Рекомендации по теме
Комментарии
Автор

Thanks! These detailed how-to videos are terrific!

danielhaupert
Автор

I'm really interested to hear if you like the EG4 18Kpv over the Sol Ark 15K

JakeGuptill
Автор

What type and size of wire gutter is that? Great videos by the way!

diySolarPowerFunWithRay
Автор

thanks. I've been wondering if the CTs could be in the same conduit as the 3 wires to the sol-ark. the manual also shows the CTs on the grid side of the meter (ie outside) so i'm glad to see that isn't required.

mlafn
Автор

Awesome. If you were to add a "Bypass" switch, for maintenance work, where do you think you would place that? I think usually people put that where your fusible disconnect is.

diySolarPowerFunWithRay
Автор

Did you have to run new wires from your meter to the disconnect?

julianc
Автор

What model is your disconnect? Looks nice.

jonathanbyers
Автор

Thanks for this. Very helpful. Question: Are you replacing the Sol-Ark with the EG?

SkyCharter
Автор

How would you or why didn’t you wire in a transfer switch inline?

jeffreyvictor
Автор

Another question: Why the reduction of Grid "fusing" to 175 amps from what I assume is 200 amp service?

SkyCharter
Автор

do you ground neutural bond in your ac disconnect but not in main panel? if you were ground neutral bond in main how would you do differently in your ac disconnect

liwei-gswd
Автор

does an ac disconnect consider a main panel if installed before this main service panel? my ac disconnect doesn't have any breaker it's a manual switch for disconnecting the meter from the main service manually it has 2 200amp fuse inside. so my question is if do i need a ground neutral bond in ac-disconnect switch and isolated the ground neutral bond in main service panel. or is going to be ok just ground wire into my main service panel with breakers? the existing grounding system?

liwei-gswd
Автор

Sorry, one more question? Does your utility require a grid connection switched placed where they can cut the grid tie by their personnel?

SkyCharter