42nd Street Shuttle Track Layout Explained in under 1 minute #shorts #nyc #nycmetro #mtasubway

preview_player
Показать описание

Рекомендации по теме
Комментарии
Автор

There might still be a way to run three trains on the shuttle, since it’s one of the world’s busiest 2-station railway lines. At TSQ, eliminate track 1 and keep track 4 and at GCT, do it vice versa, in order to retain connections at both ends. With each station having only one track, Connect tracks 1 and 4 with each other just before each station. That way, three 6-car trains can run on the line by passing each other on the double tracked section in the same manner as on the double tracked section at Botanic Garden on the Franklin Ave Shuttle. This would also put the doors on both sides of all trains to proper use.

anonymous