Big mistakes that made this building failure 😑

preview_player
Показать описание
Help others, God will help you in return

access to my courses: click link below

my business WhatsApp: +92 3254065292

love you dears.
Рекомендации по теме
Комментарии
Автор

I am a doctor, but i always tell ppl that you don't need to be a doctor to save lives. this analysis can save many lives. grt work engineer boy keep it up

josephpeter
Автор

Without even studying engineering, I can tell the structure feels wobbly.

rahulvaidya
Автор

Structural failures that cause structures to collapse can be prevented by following safety standards and specifications required by designers, builders, and specifications. Elementary safety standards must not be postponed or forgotten and the quality of materials must be optimal. Fortunately in this example, there were no fatalities to mourn. The explanations are concise and precise and it gives us a great teaching in the field of Civil Engineering. Great video. Thanks.

MilciadesAndrion
Автор

Its just the beginning.
We will get this kind of many engineers in lockdown.

jagruknagrik
Автор

This explanation was very good and scientific way ..you have good way of focusing on the first Problem which caused other problems.🔥

roshanaw
Автор

The problem is simple, don’t use chopsticks to hold up a structure..

timange
Автор

The only reason is wrong equipment, they should rent proper standard scaffold that ensure safety to workers

muhdharith
Автор

*That's the heaviest Indian accent*

carljohnson-
Автор

The main problem is there are no load bearing walls or columns & peripheral wall to carry the load this is what happens when it’s not under engineers supervision

MS-zkpx
Автор

I think major root cause are
1. Central roof don't have any column.
2. Rebar overlapping is provided on centre of roof. There must be single straight piece rebar and must be lock with corner columns rebar like cranking system rebaring or plate beam system rebaring..

TheHunter
Автор

This analysis must be shown in ALL architecture & civil engineering colleges.

sp-tjye
Автор

The prime reasons maybe
1.Props are not perpendicular
2.double stage props were given which are always very dangerous
3.The base ground should be compacted well and should be laid with PCC before propping
4.Before concreting proper checking about props stability was not done.

muralikrishna
Автор

In construction beam design we take that the percentage of steel should be maximum or more than the minimum percentage of steel ... My question is that what if the minimum percentage of steel is maximum or more than the percentage of seel?
Also I want to ask that which type of beam is most economical of the given types? Singly Reinforced, Doubly reinforced and T-beams?

fadedmusic
Автор

The main reason is Failure of Beams due to improper specifications. The C-C distance between Columns look more than permitted.

RK-MAHAVADI
Автор

The slab had no support. They should have placed beams between the columns. Still the clear span between the column on longer length is too high I think.

sheldoncooper
Автор

feel like watching TENET!!! but nice video

onlinechatter
Автор

On the bright side, they can collect remaining concrete and can build a compound near their building and now they know they have to modify their structure and will avoid collapsing before furnishing it

tropicthunder
Автор

This video is Very useful and experience for engineers
Before avoid the mistakes

BoomibalanMurugesan
Автор

apart from the expanse being too wide without additional columns, they may not wait for the columns underneath to solidify.

ungreen
Автор

I think The main reason is front side it has only 2 columns . In a large distance area

cktechedu