How to Download Primavera P6 Free | Complete Installation Process | Free and Legal Copy from Oracle

preview_player
Показать описание
This Video will explain to download and install the latest version of Primavera P6 Professional or any other edition you may wish.

Complete Guide from Downloading to Installation and server setup explained step by step in detail.

No company domain email ID needed.
100% Free and Authentic Source for Downloading of files.

Primavera P6 or Primavera P6 Professional is an easy to use project management software. Primavera P6 is the standard for planning and scheduling of projects.

Manage projects of any size with Primavera P6 EPPM. Robust, and easy-to-use, project management masters degree not needed, Primavera P6 EPPM is the solution for globally prioritizing, planning, managing, and executing projects, programs, and portfolios.

Oracle Primavera P6 download has been made easy thanks to Oracle edelivery module.

Key Business Benefits:

Increased planning efficiency
Reduced risk of schedule overruns
Visibility to identify bottlenecks and take corrective action early
Insight into current and future resource usage for accurate forecasts and decisions
Resolve overallocation through leveling or changing resource assignments

Following are the key features of Primavera P6

1. Plan, schedule, and control large-scale programs and individual projects
2. Secure multiuser access to schedules
3. Allow project managers to coordinate costs
4. Open and schedule multiple projects simultaneously
5. Adaptable views
6. Team member interfaces for gathering status updates

Primavera P6 Resource Management

Optimize resources to keep projects on track
Role and resource optimization, demand, and capacity planning
Communicate resource requirements and decisions throughout the project lifecycle
Explore scenarios with what-if analysis
Graphical analysis of resource and role utilization
Рекомендации по теме
Комментарии
Автор

The end part didnt save as existing database. So we tick the add New and then back ticking add to existing database. Overall it worked so well. Thank u so much for this tutorial.

FiveandCook
Автор

Awesome, This is what I have been looking for past few days.

engr.muhammadhassanaziz