Watch Bob's Cnc Kl 744 Come To Life In Part 3 Of The Build Series!

preview_player
Показать описание
Bobs CNC KL-744 comes to life in the third and final part. In Part 3, we install all the plumbing needed from the vacuum pump to the bottom of the CNC. This is the final steps of building the Bobs CNC KL-744 as well as the vacuum table addition.
00:00 Introduction
00:10 Assembling Canister Filter Components
00:23 Connecting 3" PVC Mainline To Vacuum Pump
00:35 Dry Filling All of the PVC Joints
01:47 Cementing All PVC Joints Together
02:04 Installing the Relief Valve to manifold
02:30 Thank You For Watching
Рекомендации по теме
Комментарии
Автор

DO NOT make it level. You will have dead water sitting about in the pipe. You need at least 3/5 degrees fall on all drainpipes then gravity is assisted

tonyfoxley