Construction Scheduling Training: An Introduction

preview_player
Показать описание
Рекомендации по теме
Комментарии
Автор

EXCELLENT Presentation on the Need of Scheduling, Dr. Saleh may you Live long .thanks alot

engrkamranullahkhan
Автор

Hendrix mgawana
Thank you for the help in this career of civil engineering
scheduling thanks so much prof Saleh.

hendrixmgawana
Автор

Thank you for a very informative lecture. I really enjoy your teaching style.

rickmartin
Автор

Indeed a very good lecture which covers the practical scenario of construction projects all over the world and specially it also have information of GCC country projects Like UAE; KSA etc. I really enjoyed the lecture from beginning to the end without diverting my concentration. This pulling of 100% attraction of a viewer is the art of a renowned lecturer/ Professor Dr. Saleh. What i can say simply is HATS OF TO YOU SIR.

hiiiiiiii
Автор

You cannnot use the schedule for the in and out cash flow without cost loading either way front load or back load. The most important usage og the schedule is tracking the project progress.

rkjayaram
Автор

my pleasure to know more , about p6 thank you so much

sangkothedreamer
Автор

This is applicable only for a cost reimbursable contract. What if the contract is a Lump Sum Turn Key (LSTK) contract?

nirmalsurendranmenon
Автор

SIR, THAT IS WHAT HAPPEN TO OUR PROJECT WE FINISH ONE SO WE SIGN THE NEW PROJECT BUT THE PAYMENT TAKES 1.5 YRS BEFORE WE RECEIVED THE RESULT WE ARE TERMINATED BECAUSE OF LACK OF FINANCIAL SUPPORT.

carlodigma
Автор

hey your lecture was awesome. Can you please send me some .xer files for EPC projects?

joshingeorge
Автор

Do you train on project scheduling. I am interested.

adedejiyesufu