Hello, this is Anthony with Arista.
Just continuing on with the issues that we're having getting wires into units.
The picture that I'm showing you here… this section, the bottom section, was entirely covered with one piece of sheetrock with zero access panel and zero intention for access panel. This piece of plywood is what was under that and that piece of plywood went between these two bars here.
Our electrical section is up in here. You can see I’m completely limited as far as access. This is a laundry room so getting to the electrical panel requires standing or squatting on top of the washer/dryer to gain access.
I did have a conversation with the millwork contractor. He is going to work on getting us a small access located from the drain pan to the wall. There are many others like this.
This is what we're up against in being able to get wires inside the unit, tied in addresses and dip switches set so that we limit the amount of access that we'll need when we come to do start up.
TRANSCRIPTION:
Hello, this is Anthony with Arista.
Just continuing on with the issues that we're having getting wires into units.
The picture that I'm showing you here… this section, the bottom section, was entirely covered with one piece of sheetrock with zero access panel and zero intention for access panel. This piece of plywood is what was under that and that piece of plywood went between these two bars here.
Our electrical section is up in here. You can see I’m completely limited as far as access. This is a laundry room so getting to the electrical panel requires standing or squatting on top of the washer/dryer to gain access.
I did have a conversation with the millwork contractor. He is going to work on getting us a small access located from the drain pan to the wall. There are many others like this.
This is what we're up against in being able to get wires inside the unit, tied in addresses and dip switches set so that we limit the amount of access that we'll need when we come to do start up.