Monopile installation - Sandbank Offshore Wind Farm

preview_player
Показать описание
In support of the foundation installations for Sandbank offshore wind farm by Bilfinger, TWD provided the detailed designs for a monopile gripper tool, hydro sound demper (HSD) deployment frame and upending hinge.

In addition we designed various seafastening structures for the monopiles and transition pieces. All items were designed, fabricated, and ready for operation within 9 months.

Bilfinger captured the installation process into a movie, which is worth watching it!

Рекомендации по теме
Комментарии
Автор

Hi there,
Can a jack up vessel install Mono piles in low water depths (4-5 meters)? In general, are there any challenges for using a jack up vessel in low water depths compared to a deeper water depth?

imran
Автор

How can l obtain a copy of your video catalouge?

ogi-oluadebisi