Theodolite 1 - Intro & Setup

preview_player
Показать описание
Theodolite 1 - Intro & Setup, OTEN Building and Construction
Рекомендации по теме
Комментарии
Автор

Shout-out to everyone watching this over and over again in surveying class

robk
Автор

It's very helpful for me here in Nigeria

dooshimaaguh
Автор

With all due respect, if you worked for me, I wouldn't let you touch a theodolite! I would use you as a rod man. I have been working in surveying for more than fifty years(yes, I am old) and am still working. No self-respecting instrument man would set up like this. First, we use a light weight plumb bob while setting the tripod for rough centering(the tripod should have a plum bob clip to hand the plum bob). Then we level the instrument COMPLETELY, otherwise it would be folly to use the optical plummet. The instrument must be leveled in BOTH directions, not just one as you did. Then we use the optical plummet for fine adjustment over the point. Then we level again and check again. Usually, that is enough. The entire process should take no more than half a minute or so. People on the job don't want to wait around while you fiddle. I will give you credit in that this seems to be the inane method currently taught to unsuspecting students. By the way, fifty years ago we used steel circle transits with no optical plummet, just a heavy plum bob. I could set up perfectly in around thirty seconds(even in the wind). The world record was around ten seconds!(Yes, there were competitions!). So, let's stop using this "modern" insane method and use what professionals use: a plumb bob for the rough setup.

johntiloshvilli
Автор

The foot screws on the tribrach were some way off the central position before he started. Better to be central so you have equal opportunity for adjustment both ways on each screw. Also when checking the plate bubble, adjust the foot screws in both planes (x and y) to ensure the instrument is positioned level. Nice simple video for beginners.

theboycalledleaf
Автор

This thing is still a pain in the ass to setup

Demano_
Автор

When using the plate level, you also need to rotate 90 degrees, and level ( with the 3rd screw only), and repeat, until level both ways, and still over the point.

happyjack
Автор

Thanks you sir. I'm new and I hope it's will give me a lot experience in future .

abrarahmad
Автор

You wanna save a bunch of time...????
Set up over the pin looking through the down periscope. Don't even think about touching the screws yet.
The bullseye bubble is just to get you close the critical vial is what you want to be gospel when you can spin it round & the long vial(critical vial)
Remains spot on level through 360, 780 etc are you ready to go but we're not there yet.
Next use the legs to get level w/the bubble just fast & dirty. Check down scope for set up move if necessary. If you start turning dials @ this point it will move far from its mark & you'll be repositioning it all damn day.
After leg leveling & the bubble seems to stay in its circle your still not there if the critical vile isn't spot on through rotation but real close now use the dials for fine tuning & last positioning. & when leveling 1 leg & 1 dial you should never move. It's on 3 legs & has 3 dials use two legs to level up to one leg and two dials to level up to the dial that was over the stationary leg. I'm no professor at this just years behind one laying out commercial buildings as a carpenter. When everybody's screaming for layout lines on the site time needs to be saved without throwing down dirty layout or a busted grid. Layout personnel need time backcheck their work or it's gonna be the curly shuffle

BillMarcipan
Автор

I suggest of a better camera angle while you are doing adjustments.

jaysonsantiago
Автор

thanks it helped a lot .... can you provide with any guide book or leaflet where one can learn about total station survey. Thaks again

sumaiyasarwat
Автор

Would you not use a plumb bob to accurately place the instrument?

Turtlefarm
Автор

seldom use theodolite except if you need need a second instrument for observing angular intersection for the purpose of monitoring verticality

mazmurnintyone
Автор

i guess what he could have done wrong is doing the leveling out of order

osugaby
Автор

Are all digital theodolites as simple as this one? What make and model is it?

brendanclarke
Автор

I do not understand??? This process was taught in class as well. I highly disagree. A torpedo level and plumb bob is required.
Correct process.
1. extend legs and place level on top of tripod, and level
2. hang plumb bob and move over pin
3. recheck plumb bob level
4. connect Theodolite and check level and pin

The problem with the way which is shown in the video is that the base for the theodolite is not level. So when our engineer in the video used the plumb sight to get over the pin, he was still off with his levelness of the base, which is a big issue. Time, it is a waste of time. efficiency is required.

I argued with my classmates about this and they disagreed. However, they are wrong, this video is wrong, and I am correct. I know that my way is correct.

Furthermore, when our engineer slides the theodolite to center over the pin, his levelness will be thrown off, because his base is not what? correct, is not level. thus this videos process is just fighting a losing battle.

I am a bricklayer and this is how any bricklayer would perform this task. thanks.

enobgin
Автор

he's doing this ass backwards, I would sequence this differently

joescriver
Автор

Is it possible to get a transcript of these videos? Dave's speech impediment makes it a little difficult to understand what he says sometimes, and I'm rewinding and replaying the video over and over to try and decipher it. Very confusing.

daisy
Автор

need to work on setting things up. there are better methods than whats shown here

vninecouchclimber
Автор

Another great instructional video, just a annoying music going on all the time, please stop doing it it's not a pop show

simonfunwithtrains
Автор

Please dont try to learn the correct method from this video.

happyjack