Clair Ridge - topsides installation

preview_player
Показать описание
16,000 combined tonnes of weight. 3 modules. 75km out to sea. Watch this incredible ‪‎timelapse‬ of the topsides being installed on our Clair Ridge platform, offshore UK
Рекомендации по теме
Комментарии
Автор

I'm very proud to join this project as a HHI Construction team.
Cheers.

ungseopshin
Автор

honored to be involved into the LQ design

offshor
Автор

Operations captured on video like this are really powerful communication aids for those that lack offshore experience....thank you BP

opsinputlimited
Автор

Amazingly done and put together like a LEGO :)

rolandnassar
Автор

Great video showing HMC expertise but sad thing is that BP chose to build these modules in south east asia rather than give contracts to uk oil and gas yards nothing to do with expertise all to do with costs. Uk yards struggle on as major companies like BP get the jonbs built abroad another sell out by the government and a major uk oil and gas

markcrawford
Автор

Proud that we are part of the final installation project supporting the Thialf with our CTV Seazip 4  (the small blue boat)  www.seazip.com

jrarends
Автор

David, are you involved in Claire Ridge? Alisdair

alisdairharrison
Автор

Build it Anywhere But Britain Petroleum strikes again.

ianwalton