filmov
tv
Alliance Steel's New Headquarters and Processing Facility
Показать описание
In May of 2020, Alliance Steel sets down new roots in Gary, Indiana. The new headquarters and processing facility is strategically placed near highways and major mills.
The plant includes 300,000 square feet of material processing and storage space (temperature controlled), 15 overhead cranes, full - service rail, drive-through bays, recessed/ headed docks for van and flatbed loading, coil slitting, laser cutting, multi- blanking and cut - to - length, stretcher leveling, and so much more.
The plant includes 300,000 square feet of material processing and storage space (temperature controlled), 15 overhead cranes, full - service rail, drive-through bays, recessed/ headed docks for van and flatbed loading, coil slitting, laser cutting, multi- blanking and cut - to - length, stretcher leveling, and so much more.