Offshore Platform Installation- Jacket Installation and Topside Installation

preview_player
Показать описание

Oceanic 5000 is a DP2 Derrick Lay Vessel which can install offshore structures including jackets and topsides weighing up to 4400MT. The state-of-the-art Oceanic 5000 can also lay subsea pipelines utilizing her two double-joint stations resulting in considerable increase in lay rates. This video demonstrates installation of a 2000t jacket by launching method and a 1500t topside (deck) by lifting method.

The entire pipe lay assembly process is carried out below the main working deck. This allows maximum pipe storage above deck and more free deck space for structural installation; thereby providing a safer and more productive working condition.

The vessel is equipped with a specially-designed “piggy-back” system for the installation of carrier pipes to be simultaneously attached to the main trunk line during the lay operation.

The stinger is 74 meters long connected by a hinged A-frame to the stern.
The vessel is equipped with three 80T tensioners. The crane is designed to address the majority of lifting requirements including heavy lift installations, near shore lifting, and platform removal.

The lift capacities of the main block (4400mt at 37 meters) and the auxiliary block (800mt at 35 meters) enable the vessel to undertake an impressive range of projects. Moreover, the 3000T fully-revolving condition increases efficiency, workability and control of heavy lift operations.

Oceanic 5000′s relatively shallow draft provides access to work in shallow waters and fabrication yards. This versatility, combined with the ability to utilize both anchor and DP2 positioning systems, enable OMC the flexibility to perform the entire scope of work irrespective of water depths.

The vessel propulsion system, designed to transit at 12 knots, allows her to reach locations in a swift and cost-effective manner.
Рекомендации по теме
Комментарии
Автор

I am a surveyor and i love this job, including positioning of jackets, and rig moves, and pile monitoring

nsikakobongeyakz
Автор

Challenging work.. Keep safe always 👍👍👍

soniachannel
Автор

I like this video. it shows the nitty-gritty of some of the installation which is the impressive bit, to me.

I will say, strange music track ; it made me keep expecting some Seal Team or other covert specialists w/ painted faces to jump over the rails & hold ground against pursuants.

jffry
Автор

I like this job and because this i am offshore technitian now .👌👌👌💪🚢

laguerreetlapaix
Автор

Perfect lifting. I am crane supervisor

KrishanKumar-iokp
Автор

Iam finding me very lucky...i also used to be a part of oceanic 5000 Crue ..it's an amazing ship

veekay
Автор

Good job structure bros..( I'm piping fitter on the platform)

Permusnah_Kebangangan
Автор

I try find the institute training welding school....but nothing show program welding 6GR..only 6G, 6GC AND 6G T.I.G(ARGON)..

kim_bargewelderplatepipeoi
Автор

Nice I like it l am an combination welder of COper nickel CS, SS, Aloy, & dissimilar. I have 12 years experience onshore projects in different company's in Ghulf countries .l am looking for a

naseemgul
Автор

Really it's a great job. . I'm First Aider. . From Trojan General Contracting LLC. .. there have any requirements. . For any jobs like First Aider, , Time keeper, , Documents Controling, , Store keeper .. SST Safety officer. .

arvindkumararvindkumar
Автор

My dream to make a part of oil rigging compnay job

usmanali-wtew
Автор

why is there a dragonfly in the middle of the ocean

iceb
Автор

I love welding welder to, how to become welder offshore...what kind certificate use..card pass welder use....that i dont know it...
Many time i interview for a apply welder job...but they say must be have 6GR

kim_bargewelderplatepipeoi
Автор

Akad MQ offshore instalation jacket and industrial oil and gas e-Commerce from pt. Kraft ìndonesia

liairawati