Super Heavy Booster 4 was lifted onto the Orbital Launch Mount for a second time, potentially for fit checks. Meanwhile, work on Ship 20's Thermal Protection System Tiles, the foundation for the new High Bay, and the Chopstick arms continued.
All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.
Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel.
L2 Boca Chica (more clips and photos) from BC's very early days to today.
0:00 - Sunrise Over Boca Chica
1:10 - Workers Continue Replacing Damaged TPS Tiles on S20
1:50 - Crews Working in Ship 20's Engine Bay
2:10 - The Orbital Launch Table Ready for Booster 4
2:30 - Work Continues on the Chopsticks
2:50 - Pneumatic or Hydraulic Lines on the Chopsticks
3:20 - Foundation Work for the New High Bay
3:40 - Liquid Nitrogen Transfer at the Propellant Production Site
4:15 - GSE Tank 8 in the Mid Bay
4:30 - Work Continues on the Possible Quick Disconnect Arm Extension
4:50 - Booster 4 Readied for Lift on to the Orbital Launch Mount
5:10 - Booster 4 in the Air with All 29 Raptor Engines
7:40 - Booster 4 Secured to the Orbital Launch Mount
8:00 - Crews Work on GSE Tank 7
9:10 - Work Continues on Orbital Launch Tower
9:30 - Ship 20 Being Prepared for Testing
10:10 - Workers Removing Damaged TPS Tiles on Ship 20
All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.
Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel.
L2 Boca Chica (more clips and photos) from BC's very early days to today.
0:00 - Sunrise Over Boca Chica
1:10 - Workers Continue Replacing Damaged TPS Tiles on S20
1:50 - Crews Working in Ship 20's Engine Bay
2:10 - The Orbital Launch Table Ready for Booster 4
2:30 - Work Continues on the Chopsticks
2:50 - Pneumatic or Hydraulic Lines on the Chopsticks
3:20 - Foundation Work for the New High Bay
3:40 - Liquid Nitrogen Transfer at the Propellant Production Site
4:15 - GSE Tank 8 in the Mid Bay
4:30 - Work Continues on the Possible Quick Disconnect Arm Extension
4:50 - Booster 4 Readied for Lift on to the Orbital Launch Mount
5:10 - Booster 4 in the Air with All 29 Raptor Engines
7:40 - Booster 4 Secured to the Orbital Launch Mount
8:00 - Crews Work on GSE Tank 7
9:10 - Work Continues on Orbital Launch Tower
9:30 - Ship 20 Being Prepared for Testing
10:10 - Workers Removing Damaged TPS Tiles on Ship 20