Microsoft reveals its MASSIVE data center (Full Tour)

preview_player
Показать описание
At CES 2021, Microsoft's Brad Smith gives a tour of Microsoft's massive data center in Quincy, Washington, where the company runs its cloud operations.
Рекомендации по теме
Комментарии
Автор

Not very much detail or information for a "full tour"

whatsupwes
Автор

"Full tour" Apparently means here look at 1 Isle, and outside ... so in depth

brynnvixxen
Автор

I work in one of these DCs. And i like how they found the one aisle with no blinking error lights

AllAmericanfrvr
Автор

1:40 First Rule in Datacenters: Don't touch anything randomly. Especially not cables!

alcarsharif
Автор

This is actually the super computer AI that powers clippy

alexk
Автор

This was the shortest datacenter tour ever. “Here’s a few racks and wooowwww they have a UPS and generator solution just like every other datacenter on earth.

GetCTOwned
Автор

I’m a construction electrician & I build these buildings in Chicagoland. It’s the most consistent work in covid times. The building and systems we are making is absolutely amazing.

briancavanaugh
Автор

We learned more about the diesel generators than the actual hardware inside the data center. What a worthless clickbait.

imapersonnotachanneldammit
Автор

0:30 There are more than 20 buildings, each large enough to house 2 aircrafts
0:35 2 million square feet and 300 acres
1:29 Almost half a million server computers

Discovery_and_Change
Автор

Cool, but didn’t really tell us anything

velociraptor
Автор

What's impressive about this is the software that runs on it. I make my living on Microsoft mostly. A lot of companies can buy half a million computers or even more, but not that many can build the kind of cloud that Microsoft, Google, Amazon have done.

chris.sharp-
Автор

Really proud of this facility. It’s a beautiful beast of a DC. So much work and it’s just amazing to see what we built from dirt to energize

BosleyBeats
Автор

It's a data center folks. That 1 aisle looks like all of the others in all of the buildings. Take a few hundred thousand hard drives and stack them on top of each other, then spend 8 hours just looking at them all and get back to me on what all you really missed from only seeing that 1 aisle.

syberphish
Автор

Wow you get access to the a azure data center and this is all you show.. Very little information as well. This could easily be a 20 min video

Keyakina
Автор

Around two minutes some guy fondled some fiber optic cable... that's why Exchange 362 went down again...

darkpixelk
Автор

"there are more than 20 buildings" <--- too hard to be any more specific than that?

grbu
Автор

CEO struts his massive CEO legs. Never skips leg day at the Data Centre.

shin-ishikiri-no
Автор

The tour was trash, he didn't say anything yet he never stopped talking.

cheesefries
Автор

Show the full footage of the building with drone

But

Only show single cluster

Arctic_silverstreak
Автор

Uh, nice "full" tour huh? Thanks.

drewzerbruizer