filmov
tv
Clemson ME401 Wind Tunnel Lift Testing - Team 4

Показать описание
This is the wind tunnel and lift test developed by group 4 in ME401 at Clemson University during Spring of 2011.
Clemson ME401 Wind Tunnel Lift Testing - Team 4
Clemson ME401 Early Lift Test
Clemson ME401 Wind Tunnel Drag Testing - Team 4
Clemson ME 401 Lift.MP4
Clemson ME 401 Wind Tunnel Assembly.MP4
Clemson ME 401 Vertical Wind Tunnel Setup.MP4
ME401 Clemson University Wind Tunnel Power Generation
ME 401 Group 6 Wind Tunnel - Lift Experiment
BWML3 Wind Tunnel Instruction Video
ME 401 BWC2: Wind Tunnel Promotional Video
Wind Tunnel Operation Instructions
Wind Tunnel Project: A quick demonstration of Lift (Force)
ME 401 Group 6 Drag Experiment
ME 401 BWC2 Wind Tunnel Design Project Fall 2014
Clemson ME 401 Erosion.mp4
Drag Experiment Instructions
ME 401 Group 2 Wind Tunnel
Wind Tunnel Team 1 (Spring 2015) - Wind Tunnel Assembly and Operation
ME 401 Group 6 Lift Experiment
Clemson ME 401 Fluidized Bed.MP4
Measurements I-Running the Measurements Lab Wind Tunnel
Wind Tunnel Team A ME 4010 Spring 2015
2011_Engineers Design Expo.mov
Clemson 401 Drag.MP4
Комментарии