Economic Analysis in Aspen HYSYS

preview_player
Показать описание
The tutorial explains how to use Aspen Process Economic Analyzer.
Рекомендации по теме
Комментарии
Автор

Thank you very much, sir for this helpful video. But is there a similar video that treats Economic analyzer for Aspen plus sir as I need it for my design project. Thank you sir

tahirbashir
Автор

Great Work Dr Zaman, it helped alot. If possible please send me this Hsys file.

suhelahmad
Автор

Dr. Zaman you elaborated effectively.

Great help
Thankyou very Much

drkaleemphd
Автор

Thanks Dr. Sajid for the informative lesson 👏

uyendao
Автор

Hi, thanks for your video. normally a stream contains multiple components (reactor effluent), how to define price of each component in that case as aspen offers to define stream price only!

syedejazhaider
Автор

Dear Dr.Zaman,
Thank you for the video, it's very helpful.
What should we do if an equipment does not exist in the APEA library?
In my case, I am simulating an electrolysis process and I don't know how to include the electrolyzer in the economic alnalysis.

dohaelrhoul
Автор

"ERROR> 'HE - 6' THICKNESS CALCULATED EXCEEDS 25 PCT OF PORT DIAMETER
Thickness CALC: 6.250 INCHES", ERROR> 'GC - 2' INLET TEMPERATURE IS OUT OF RANGE, how can i fix this errors?

ignacio
Автор

Thank you Dr. Sajid for the lecture. If I want to edit the excell spreadsheet (in this case i want to add some project cost componen e.g. offsite facilities CAPEX or add VAT), will the result generate automatically ( in this case for NPV, IRR)? I assume that excell spreadsheets are linked function.

ragilpriyanto
Автор

Can you, please, explain if it is possible to change the plant location? Even if you choose different template (Chinese/EU metric), it gives Plant Location: North America.

nazarbekmukhamed