filmov
tv
Все публикации
0:02:26
14 TP483000D Connecting the Load and Battery Supply
0:00:56
15 TP483000D Replacing a Rectifier
0:01:21
13 TP483000D Powering On the Rectifier Cabinet
0:02:13
12 TP483000D Powering On the AC Cabinet
0:00:49
10 TP483000D Connecting DC Output Power Cables to the DC Cabinet
0:01:19
11 Checking the Temperature Rise of the Power System
0:01:26
08 TP483000D Connecting AC Input Power Cables to the Rectifier Cabinet
0:01:11
10 Checking Electrical Information
0:00:46
09 Checking the status of Rectifier Indicators
0:01:06
08 Checking Operating Information
0:01:15
09 TP483000D Connecting AC Input Power Cables to the AC Cabinet
0:00:57
07 TP483000D Connecting a DC Input Power Cable to the Power Distribution Monitoring Unit in the AC C
0:01:17
06 TP483000D Connecting CAN Cables Between Cabinets
0:00:48
07 Checking Parameter settings
0:01:03
06 Checking the Grounding and Safety Protection
0:01:22
03 TP483000D Installing Cabinet Ground Cables
0:01:33
04 Checking Cabinet Installation
0:00:48
05 Checking the Cabinet Electrical Connections
0:02:10
04 TP483000D Setting DIP Switches
0:00:47
02 TP483000D Removing Fuses from the DC Cabinet
0:00:48
03 Checking the Cabinet Appearance
0:01:00
02 Checking the Equipment Room Design and Layout
0:00:54
01 Checking Basic Device Information
0:02:45
01 TP483000D Installing Cabinets
Вперёд