filmov
tv
Все публикации
0:27:38
Bedroom fit, booth bed, shelves & wardrobe Pt7 - Fitting the doors Hettich soft close cabinet hinges
0:27:22
Bedroom fit, booth bed, shelves & wardrobe Pt8 - Installing the wardrobe carcass after it's sprayed.
0:24:11
Bedroom fit, booth bed, shelves & wardrobe Pt6 - Building wardrobe carcass, Dewalt biscuit jointer
0:13:20
Bedroom fit, booth bed, shelves & wardrobe Pt5 - Wardrobe boards, GRS-16PE Rail Square, Makita track
0:22:25
Bedroom fit, booth bed, shelves & wardrobe Pt4 - Fitting bed end cap mitres Domino DF700 & spraying.
0:11:25
Bedroom fit, booth bed, shelves & wardrobe Pt3, - Sawing & planing the Beech bed end cap.
0:31:41
Bedroom fit, booth bed, shelves & wardrobe Pt2. - Ply on frame, make skirting, keyholes slot fixings
0:29:50
Bedroom fit, booth bed, shelves & wardrobe Pt1 - Building the bed end & shelves frame.
0:12:21
Respraying the damaged desk top with PU enamel paint & a Devilbiss FLG5 spraygun
0:01:00
Makita Plunge saw dust bags, Is there one that fits? #woodworking #powertools #tracksaw #joinery
0:03:25
The best scribers for joinery I've ever had, Staedtler Mars Comfort 551 01 compass, modified point.
0:04:12
Dewalt DCW682 vs Makita DPJ180 biscuit jointer, why I bought the Dewalt just after buying the Makita
0:22:57
Reclaimed doors made into a built-in alcove cupboard Pt2 of 2. Fitting everything in the alcove
0:24:43
Reclaimed doors made into a built-in alcove cupboard Pt1 of 2. Altering the doors & making the frame
0:27:21
Built in bed over bulkhead build Pt9 Final - This is the last video this series, finishing the bed
0:19:08
Built in bed over bulkhead build Pt8 - More fitting everything on site, building the shelf unit.
0:21:29
Built in bed over bulkhead build Pt7 - Start fitting on site, building the main bed frame.
0:22:14
Built-in bed over bulkhead build Pt4 - Making the shelf unit, TSO GSR-16 PE V2 Sq, Biscuit Jointer
0:20:57
Built-in bed over bulkhead build Pt5 - Making the shelf unit, TSO GSR-16 PE V2 Sq, Biscuit Jointer
0:13:53
Built-in bed over bulkhead build Pt2 - Gluing the side frame together & making the four small doors
0:16:54
Built-in bed over bulkhead build Pt6 - Spraying the frame, doors & shelf unit with PU lacquer
0:24:44
Built-in bed over bulkhead build Pt1 - Cutting & planing the wood for the bed side frame
0:26:06
Built-in bed over bulkhead build Pt3 - Finishing the bed frame, cutting finger pull handles in doors
0:09:34
Kite winder stair build Pt5 fitting the railings, Final. Drilling tiles Marcrist PG750x diamond bit
Вперёд
join shbcf.ru