NASA updates Artemis moon mission launch preps

preview_player
Показать описание
#nasa #artemis #space

Briefing participants include:

Jim Free, associate administrator, Exploration Systems Development Mission Directorate, NASA Headquarters
Cliff Lanham, senior vehicle operations manager, Exploration Ground Systems Program, Kennedy

Teams are on track to roll the Space Launch System rocket and Orion spacecraft from the Vehicle Assembly Building (VAB) to Launch Pad 39B no earlier than Friday, Nov. 4 with first motion targeted for 12:01 a.m. EDT.

Minor repairs identified through detailed inspections are mostly completed. Preparations are underway to ready the mobile launcher and VAB for rollout by configuring the mobile launcher arms and umbilicals and continuing to retract the access platforms surrounding SLS and Orion as work is completed.

Testing of the reaction control system on the twin solid rocket booters, as well as the installation of the flight batteries, is complete and those components are ready for flight. Engineers also have replaced the batteries on the interim cryogenic propulsion stage (ICPS), which was powered up for a series of tests to ensure the stage is functioning properly. Teams successfully completed final confidence checks for the ICPS, launch vehicle stage adapter and the core stage forward skirt.

Teams are continuing to work in the intertank area of the core stage and upper section of the boosters to replace batteries. These areas will remain open to support remaining battery and flight termination system activities. Flight termination system testing will start next week on the intertank and booster and once complete, those elements will be ready for launch. Charging of the secondary payloads in the Orion stage adapter is complete.

Teams recharged, replaced and reinstalled several of the radiation instruments and the crew seat accelerometer inside Orion ahead of the crew module closure for roll. Technicians will refresh the specimens for the space biology payload at the launch pad. The crew module and launch abort system hatches are closed for the roll to the pad, and engineers will perform final closeouts at the pad prior to launch.

NASA is targeting the next launch attempt of the Artemis I mission for Monday, Nov. 14 with liftoff of the Space Launch System "SLS" rocket carrying the Orion spacecraft planned during a 69-minute launch window that opens at 12:07 a.m. EST. Artemis I is an uncrewed flight test to launch SLS and send Orion around the Moon and back to Earth to thoroughly test its system before flights with astronauts.

The Carolina Weather Group operates a weekly talk show of the same name. Broadcasting each week from the Carolinas, the show is dedicated to covering weather, science, technology, and more with newsmakers from the field of atmospheric science. With co-hosts across both North Carolina and South Carolina, the show may closely feature both NC weather and SC weather, but the topics are universally enjoyable for any weather fan. Join us as we talk about weather, environment, the atmosphere, space travel, and all the technology that makes it possible.
Рекомендации по теме