How Trains Are Powered on the Railway | Third Rail vs Over Head Line Wires

preview_player
Показать описание
🚆 As we transition away from carbon-based fossil fuels, public transport is in the spotlight, especially railways. Electric trains are key to reducing our carbon footprint, but how is electricity delivered to these trains? This video dives into the two main systems: overhead lines and third rail systems. ⚡️

Explore the pros and cons of each system, and understand why one might be chosen over the other. But is electrification always the best choice? Stay tuned till the end to find out!

🛤️ Learn about the origins of these systems, their advantages, and the significant drawbacks. From cost and maintenance to safety and efficiency, we cover it all.

#RailwayElectrification #OverheadLines #ThirdRail #ElectricTrains #RailwayEngineering #PublicTransport #Decarbonization #TrainSafety #RailwayInfrastructure #SustainableTransport
Subscribe to our channel for more!

For more on Rails Track Geometry, check out this video👇👇👇

For more on the Hither Green Railway Crash, check out this video👇👇👇

For more on the Rail and the Weather, check out this Playlist👇👇👇

📖📚 Looking for a good book to help your learning? 👇Check out this one👇

📗📗FREE PDF DOWNLOAD
Free Downloadable PDF Guide for Cant!
Hit the link to get yours 👇👇👇

📖📖 Want to know more about Railway Track Geometry?
Hit this link👇👇👇

📖📖 Want to know more about Railway Components?
Hit this link👇👇👇

If you have enjoyed this video, and want to support the channel you can give me a tip at the link below! Thank you 🙏🙏🙏

Connect with us!

Video Chapter's:
00:00 - Intro
01:01 - Third rail
04:15 - Overhead line
08:19 - The move to electrification
09:32 - Summary
Рекомендации по теме
Комментарии
Автор

My father in-law was working on an overhead gantry, he slipped and came into contact with the 1500VDC used on Australian suburban trains, he survived but lost his arm just past his elbow. (boy was he lucky)
As for wires stretching during heat events, that has long been solved by using weights and pulley wheels to keep a constant tension on the lines, irrespective of the heat, have a look at 0:20 those 'things' ever side of the poles are a stack of steel plates used for such.

paulstubbs
Автор

I think you have got which units need transformers mixed up. For example, the British Rail Class 86 locos have transformers to reduce voltage from 25kv to 900v for the motors, whereas British Rail Class 423 4VEPs don't have a transformers for traction power as they get the 750v direct from the third rail. DC units without transformers require ballast to keep their centre of gravity low. British Rail Class 86s are 25kv AC OLE locos, and the British Rail Class 423 4VEPs are 750v DC third Rail units.

A-Trainspotter-From-Berkshire
Автор

One thing to add from a metallurgical and corrosion aspect on third rail. Stray current and grounds have caused a lot of corrosion on buried pipework, particularly around the the home counties area, with the victorian cast iron pipework. So whilst they don't directly affect the operation of the railways, it does pose other problems for utilities, such as Thames Water. Was a case study on my University of Surrey MSc modules about 15 years ago.

Titot
Автор

One of the disadvantages of OLE you mentioned was sagging lines. Most (if not all) lines have "automatic" tensioners installed to overcome/minimise this problem. I don't believe you mentioned this.

PaulSmith-plfo
Автор

Thanks for this clear info. Growing up in south-east England where third-rail electrification is the norm (and I spotted your Southern train as an example!), I was surprised when I first went up to York as a teenager and noticed the overhead lines and supports on lines north of London. It seemed such a blot on the landscape as well as an unthinkable task to install them all (not that putting in big heavy rails seems like easy work either though, to be fair). You did a thorough job listing the pros and cons, some of which I hadn't considered such as speed restriction.

Like others in the comments, I was confused by trains on the third rail network needing transformers, but I'll leave that to people who know more than me about trains 😅

JfromUK_
Автор

It's pretty cool to ride on a train in the dark depths of Finnish winter and see the trackside illuminated in the flickering blue glow as the pantograph constantly makes and breaks contact through the ice.

Waiting to see what they do with the Forth Bridge, whether they're going to put masts on it or run trains on battery.

yjjk
Автор

On leaving school in 1960 and gaining employment with a civils contractor in London UK, I worked the an old steam train sized tunnel being enlarged to carry overhead electrification lines. The tunnel was used to supply empty carriages into Euston Station. The tunnel is no longer used.
Later in life I was chatting with Egyptian railway engineers and the reason they gave for not using third rail, is the cost of installing and maintaining ROW fencing. Where with the use of steam, then diesel trains people and animals are free to roam across railways, in the vast expanse of the Egyptian Desert.
An experiment to reduce power and brake maintenance costs on the running of the Victoria Line Tube in London. Was to tunnel in a down grade out of stations to a mid point, then an upgrade to the next station. This to reduce acceleration power and the train can coast into the next station using the upgrade to reduce speed and use of braking. I understand this method was not used in later tube line contracts.

TheByard
Автор

Chicago sees more variety of weather than most major cities. We’ve seen temperatures from below 0F/-18C to over 100F/38C. And snow and ice so bad, switches near the main stations have permanent natural gas pipes that provide open flames in the winter to keep the switches working. Even so, there is a mix of electric power supply. The ‘L’ subway system primarily consists of third-rail with a short section (Yellow line) with both. The L tracks are famously overhead in the Loop but are also underground and at street level (some far ends). The Metra Electric/South Shore train line uses overhead lines (and until recently, had a street-running section). And the many other passenger and freight lines use diesel/electric engines.

Ddrhodes
Автор

DC powered third rail type locomotives would not be equipped with transformers, which can't be used with direct current.

heronimousbrapson
Автор

around NYC they have some trains that can run overhead and third rail as well as diesel locomotives that can run diesel or third. Dual Power diesels for example run up the Danbury branch of the New Haven line as the branch has no electrification but you also cannot run a diesel into Grand Central. So the locomotive cuts the engine and runs on the third, The Overhead and third trainsets are because the NH line shares most of its track with the NE corridor which is overhead, but the Metro North lines into NYC are all third rail.

filanfyretracker
Автор

I have for long time wondered about low frequency AC power for trains. I heard its much cheaper to produce big motors for low frequency AC than power grid frequency. Also there are frequency converters for modern units of today.

rickardandreasson
Автор

Your clip was informative, and you sound quite convincing, yet should we take everything you say at face value? Two examples:
1:43 Apart from this being a skewing tele lens catch, masts do not have to look like that. Germany in particular invested energy in designing masts that have fairly little visual influence on their surrounding. Have a look at the WP article 'overhead line', then click on the german version, then count down to the eighth photo - 'stahlflachmasten deutscher bauart'. [Another way to gather info on this would be via YT, then 'führerstandsmitfahrt' (cab ride).]
Similar masts as the ones used fx in Germany were also erected earlier in Britain. Why did your decision takers not follow course when the Paddington - Cardiff line was electrified? As far as I can see, this question was raised a number of times in the public (maybe not quite as straightforward) but never answered by those responsible.
7:34 Are you certain? There's a tension mechanism, in Germany it has been used since the early days of electrification - the learning phase was from ca 1905 to 1930, since then the overhead system has not changed substantially. (It was copied by most other countries.) If you scroll further down on that same WP page, slightly beyond mid-page to the photo 'radspannwerk DB-bauart zur getrennten abspannung von tragseil und fahrdraht'? And why not use the chance to also note the following image, 'überlappende...'

michaellaudahn
Автор

On the contrary, lower voltage DC third rail does not need a transformer, while higher voltage AC catenary wire system (like 25kV AC) requires stepdown transformer on the train.

olgakarelova
Автор

As someone who lives on Long Island, New York, United States, I am familiar with the strange marriage of both systems and unelectrified rails on the "Long Island Railroad." The line at the western most point is used by both Amtrack (overhead) and the Long Island Railroad (third rail) mostly because there is a yard on Long Island for Amtrack, but there is a rumor about a possible tunnel and extension of the Amtrack line through one of the main lines of the LIRR, meaning a significant portion of the line will have both third rail and overhead at the same time. Then we have many extensions of the line without any electrification (not to mention that the freight line is diesel electric, even when they are running on the lines with the third rail).

tzor
Автор

"Being DC, 3rd rail is inefficient."
Ba-bow!
No, Being a lower voltage, 3rd rail is inefficient.
AC or DC has nothing to do with it. End of.

johnclapshoe
Автор

Here are three things you missed:
1) Floods will also affect most overhead wires. In both third rail and overhead lines, the power returns on the running rails so if the track is flooded even overhead wire will be taken out. The only way around it would be to have 2 wires overhead. That hasn't been used much on rails but it is necessary for trolley busses.

2) A trolley pole can also be used for overhead wire collection. I think they are still used more here in the US but even here they are mainly used for museums and heritage streetcar (aka trolley, tram) lines like those in Tampa, FL and Memphis, TN. There have been other methods like the bus bar (that may not be right) which is a loop of metal that contacts the wire like a pantograph but has little support hardware like a trolley pole. This method is pretty much extinct as it was mainly used as an intermediate step between trolley poles and pantographs.

3) Another issue for overhead wires is that it restricts the loading gauge. Here in the US, most trains that carry intermodal containers are double stacked containers. In areas with overhead wire, (primarily the Northeast Corridor and some suburban electrification) only single stack containers can be run. Similarly, Amtrak's Superliner cars and other bi-level cars can't run on the northeast corridor either. That is not as much of an issue in Europe and the loading gauge from other factors limits containers and passenger cars to single level. This is not insurmountable as the Metra Electric lines in Chicago, IL run bi-levels and some French TGV's are bi-level. Of course, the wire much be much higher to allow for high height cars and thus is best done before the wire is strung. Raising the wire height significantly will usually require larger pantographs and will often require modifying bridges and tunnels or lowering the track to make the required clearance. This is not unique to overhead wire. The US railroads have spent millions if not billions of dollars to increase clearances to permit double stacks in non-electrified territory as well.

mityace
Автор

If the third tail is DC, why are there transformers in the train. Transformers only work with AC?!?

stephenphilp
Автор

Ice breakers can be installed on pantograph collectors as is done in the U.S. for the east coast commuter systems and light rail systems around the country. Third rail systems mostly use 750 volts ac. Metro North rail in New York City uses trains that can run on third rail systems as well as overhead systems of both 12, 500/2500 volts.

mikekeuleman
Автор

Interesting article. Well explained. Good job!

MikeWiggins
Автор

I live near Toronto, Ontario. At the moment, a new LRT line is being installed right down the street in front of my condo. They are going with a pantograph system and will soon be installing the wires. In Toronto, the subway system uses 3rd rail, but the streetcars recently switched from trolley pole to pantograph. The new LRT lines in Toronto will also use pantograph.

James_Knott