filmov
tv
Pre-Arrival Video: Fully Involved building at vacant lumber yard, Coplay, PA. 06/12/16

Показать описание
At 04:13 Sunday, Lehigh County 9-1-1 transmitted the box for a building fire at 1 Bridge Street sending Coplay Engine 511, Whitehall Engines 3, 13, 5 and Medic 62.
Chief 5 arrived and reported a two-story vacant 25x100 fully involved and had the second alarm transmitted.
Engine 511 brought a water supply from Front Street to supply them and Engine 3 (3831). Both engines went through the gate and into the General Supply property and stretched 5 hand lines, three 1 3/4" and two 2 1/2" lines. One additional line was stretched and operating on the Bridge Street side, Engine 13 had that line. The fire was darkened down about 30 minutes later but companies remained on scene a few hours hitting hot spots.
Chief 5 arrived and reported a two-story vacant 25x100 fully involved and had the second alarm transmitted.
Engine 511 brought a water supply from Front Street to supply them and Engine 3 (3831). Both engines went through the gate and into the General Supply property and stretched 5 hand lines, three 1 3/4" and two 2 1/2" lines. One additional line was stretched and operating on the Bridge Street side, Engine 13 had that line. The fire was darkened down about 30 minutes later but companies remained on scene a few hours hitting hot spots.
Pre-Arrival Video: Fully Involved building at vacant lumber yard, Coplay, PA. 06/12/16
PRE-ARRIVAL: Working Structure Fire in Ashland
PRE-ARRIVAL AT FULLY INVOLVED HOUSE FIRE - SYOSSET NY
Pre-arrival at a fully involved car fire at tempo park in Citrus Heights
PRE ARRIVAL FULLY INVOLVED STRUCTURE FIRE Ortley Beach New Jersey 4/6/22
Residential Structure Fire in Anaheim
Helmet cam fully involved structure fire 2021 first in fire attack
*PRE ARRIVAL* Fully Involved Truck Fire Smyrna De 5-1-22
RAW Video: Pre-Arrival to Fully-Involved Barn Fire in Lincoln, Ontario, on Mountainview Road
PRE ARRIVAL VIDEO: FATAL 2ND ALARM FULLY INVOLVED STRUCTURE FIRE. Lehigh Drive Jackson, NJ. 04/01/21
PRE ARRIVAL FULLY INVOLVED TWO ALARM STRUCTURE FIRE Brick New Jersey 6/15/23
2022-11-5 West Springfield, PA - Pre-Arrival Structure Fire Fully Involved
*FULLY INVOLVED MANSION - EAST NORWICH NY
*Pre-Arrival* *Heavy Fire* Fully Involved Federal Way House Fire
Pre-arrival fully involved car fire in Citrus Heights
Structure Fire Pre Arrival Fully Involved | Shocking bystander footage
GoPro: Ladder 2 First Due Truck for a House Fire
Pre Arrival: Fully Involved Vehicle Fire, Whitehall, Pa - 1.8.23
FDNY - Pre Arrival - Brooklyn 3rd Alarm/10-66 Box 2982 - Fire with ***Roof Collapse*** - 12/12/24
Happening Now: Fully involved tractor-trailer fire near Castleton PRE-ARRIVAL VIDEO
Fully involved. Pre arrival Structure fire. Mobile home collapses
Firefighter's bodycam shows battling housefire first-hand
Pre Arrival On 2nd Alarm Structure Fire On Revland Dr - Tecumseh Fire On Scene
PRE-ARRIVAL: Firefighters stretching in on FULLY INVOLVED shed fire | Tulsa, OK
Комментарии