Hose: Deploy 1.75' preconnect

preview_player
Показать описание
Objective: Deploy 1.75” preconnect with V-Split method.

Task Steps
1. FF chooses correct hose at the order of the engine’s officer.
2. FF places the attack section onto the right shoulder, making sure it is balanced.
3. FF steps forward and turns to the left, grabbing bights from the supply section.
4. FF pulls supply section, clearing the hose tray.
5. FF continues stretching the supply section toward the target and around any obstacles, until complete.
6. FF deploys the attack section using the V-split method.
7. FF calls for water, bleeds line, checks for stream quality and appropriate flow, giving the engineer time to set the proper pressure.
Рекомендации по теме
Комментарии
Автор

Love the idea of using straps. Keeps the hose clean

ohhoneybadgerbaby
Автор

Very impressive. The drills are very beneficial

jangoig
Автор

*clicks on video*
*gets out of truck with no gloves*
*Clicks off*

willshowman
Автор

am I the only one who does not like to see the SCBA mask flopping around?

jessnunez
Автор

What style hose load are you utilizing?

randygarza
Автор

Time to start using high pressure hose reels. From arrival, you can have water spraying within 20 seconds. And much more easy to handle - both deploying, using and packing up.

Xanthopteryx