Industrial electrical panel wiring training with all details

preview_player
Показать описание
#electrical #training #industrialelectrician #industrial #enginering#electricalpanel#switchboard
If you want to become a electrician, watch this video until the end.
In this video, we are wiring an industrial switchboard. This switchboard has six single-phase outputs and two three-phase outputs. This switchboard includes an emergency power switch and also includes a power cut warning device. In this video, we show a part of We will do the wiring and continue the training in the next video which will be uploaded three days after this video.
Рекомендации по теме
Комментарии
Автор

Great video, learned a lot so far. Just subscribed and can’t wait to watch other videos you have.

johnszott
Автор

It's easy when you have a proper service cabinet with all the lacing fixings.
Experts challenge I just did. A quad 4x4 box. 3 receptacles and a 3 way switch. Box was also a junction feeding three downstream conduits plus the lighting traveler, all wired with 12 gauge. Took me a solid half hour to stuff it so I didn't have to cram the faceplate on.

thaiexodus
Автор

Work with panels for 5 years. best work i have in electricity area.

-Felipe-
Автор

Wearing industrial electrical panels that are very detailed operation, very good ❤ 26:20

gtoalifachannel
Автор

The MTW wire is a pleasure to wire panels with. Converted 9 Grieve truck ovens from bang bang contactors to plc proportional control years ago. Very satisfying work.

slipstreamvids
Автор

Hey there!! Are you really an electrical engineer🤩🤩🤩? You are really skilled. Good job.

gauravroy
Автор

did you drill with the bolt/screw directly instead of a pilot hole with a drill bit, tab it then install a the screw

yosefali
Автор

watching this is so satisfying. thanks buddy. I subscribed.

binarumah
Автор

Very nice work and usefull video 👍
Have you got multiline diagram for this switchboard ?

Largo
Автор

I don't know bud, I'm a level below this, I'm struggling to even read what the inputs for the wires are supposed to be... N= neutral, ph=phase? auto=?? C=? NC and NO? So... I guess you wire it if you want the contactor to be normally open or normally closed I guess? I mean it's a good effort and the camera quality helps a lot but I'm still a level below this, hard for me to understand. Need to watch the video a few times and others...

llVIU
Автор

That socket towards the end seems... Weird. It has grounding pins, but no grounding wire connected, and no grounding screw either that I could see. Seems a bit unsafe tbh.

xxhellspawnedxx
Автор

Why is the three phase rccb connected to city electricity terminal box? How would it get emergency supply as you have given it input from the red terminals, not the selector switch output?

banjaree
Автор

Where should I start to watch your videos as a beginner? Thank you

EverythingEsala
Автор

Which computer software do you use for creating the panel drawing/schematic?

RizwanKhan_
Автор

Are you not using Red, Yellow (or White) and Blue for Phases, Black Neutral and Green (or yellow/Green) for earth. Are you switching the Neutral. That's a fail in New Zealand or Australia.

brentwilliams
Автор

No wire numbers ? Hard for the guy who has to trouble shoot later

hymermobiler
Автор

Sir can u tell me how much salary should I gain after 1 year of experience ❓

MAJOR
Автор

Thanks sir did you teach Online or not Sir ?

shaqeelquraishi
Автор

Good job, but this panel will not pass US National Electrical Codes, firstly, the panel space is small compared to the number of devices used, a neutral wire is used along the length of the panel, which must be used separately from the busbar, the panel is not grounded, And there is no ground terminal, it is not allowed to install the outlet on the panel body, the wires and terminals do not have address numbers, the main switch is not installed in the right place, and it is not insulated and covered...

mahomv
Автор

Please let the names of the equipment shows

abangayakubu